Difference: GrantText (4 vs. 5)

Revision 52012-10-24 - MichielVanDePanne

Line: 1 to 1
 
META TOPICPARENT name="ResearchTips"

Current DACRRI Sample Description for use in Budget Preparation

"The UBC Department of Computer Science charges for the direct costs of technical support to research grants. This includes installation and support of equipment; technical support for researchers; print, file and network servers; printing and copying; and similar direct costs. The current charge is 2% "

Proposed DACRRI Sample Description for use in Budget Preparation

"The UBC Department of Computer Science charges for the direct costs of technical support. This includes installation and support of equipment; technical support for researchers; print, file and network servers; printing and copying; and similar direct costs. The estimated costs of these services for this research project are $ DollarFigure."

Added:
>
>
The estimate for the upcoming years is based on projections of actual direct costs for the previous year.
 
Changed:
<
<
In the above text, $ DollarFigure is estimated according to the current DACRRI rate (2% for 2012/2013, 5% for 2013/2014).
>
>

In the above text, $ DollarFigure is currently estimated by the department as being 2% for 2012/2013, 5% for 2013/2014). Calculate the $ DollarFigure for your grant using this estimate.

The research-related expenses for the department should be updated on a yearly basis, and the projection revised based on this.

 
<--/commentPlugin-->
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback