Machine information
Serial number: T0333
Software version: 2.4.0p1
Vantage startup procedure
- Hold down top UPS button until beep
- Close the small breaker
- Close the main breaker
- Hit the green flashing button within one minute. If you miss this one minute window, then power-down and start over again.
MACHINE MUST BE ONE AT LEAST FOUR HOURS BEFORE BUILDING PARTS
Vantage shutdown procedure
- Hit the red button
- Wait for message "It is now safe to turn off the machine."
- Wait for fans to completely stop
- Open the main breaker
- Open the small breaker
- Hold down the middle UPS button
For most tasks, simply pushing the red button is sufficient. The UPS will beep continually until the battery is drained, but this is OK.
Procedures
Maintenance schedule
Every time |
Weekly |
Monthly |
Monthly/Quarterly |
Quarterly |
Clean platten |
Empty purge bucket |
Vacuum build envelope |
Inspect O-Ring |
Lubricate screws with TriGEL |
Lubricate guide rods with Krytox |
Inspect tip brush/wipers |
Clean vacuum filter |
Clean exterior |
Clean cone sensor |
|
|
|
|
|
|
|
|
|
|
21 Sept, MMT |
21 Sept, MMT |
21 Sept, MMT |
21 Sept, MMT |
25 Sept, MMT |
|
21 Sept, MMT |
25 Sept, MMT |
21 Sept, MMT |
21 Sept, MMT |
--
WolfgangHeidrich - 15 Mar 2006
Topic revision: r3 - 2007-06-07
- mmt