META TOPICPARENT |
name="StratasysVantage" |
-- Main.mmt - 27 Jun 2007
Replacing print head assembly
There is a black tool box with the tools you need - maybe above the printer
Preparation
- Unload Filament:
Operator Control > Change Tips/Mtl > Unload Model and Support
- Move the head into service position:
Operator Control > Move Head/Stage > Move Head to Center-Front Position
- If the material is to be changed, remove the canisters
- Power down system completely
Head removal
These instructions slightly different than those in attached Word document, because we don't have a maintenance bracket.
- Open up top of machine
- Place Head in maintenance bracket (this currently isn't available -- need to request one)
- Remove the cooling hose - loosen, but do not remove, two retaining screws (9/64 allen).
- Slide the hose flange out from under screws.
- Remove the filament tubes - press in on fitting rings while pulling out the tubes. NOTE: Tubes labeled to make assembly easier
- Remove the Head Cable, making sure to unscrew the 2 screws simultaneously and in equal amounts to avoid bending the pins
- Remove the Head Assembly - loosen the 2 head retaining screws (9/64 allen)
- Take the entire head assembly out of the machine and place on a flat surface
- Remove tips by unscrewing 2 screws on the casing of each tip. Only unscrew a half-turn at a time to prevent the threads from binding and messing up when hot. (NOTE: THIS PART IS VERY HOT)
- Slide tips out from the bottom of the casing
Head Installation
These instructions slightly different than those in attached Word document, because we don't have a maintenance bracket.
- Place Head Assembly into maintenance bracket.
- Install the tips, with the exposed metal plate on the tip facing forward.
- Screw them in tightly a half-turn at a time to prevent the threads from binding and messing up when hot. (The tip end will be able to rotate slightly.)
- Attach the Head Cable, making sure to screw the 2 screws simultaneously and in equal amounts to avoid bending the pins
- Install the filament tubes, -- push tube fully into fitting - pull up to make sure that it is secured
- Make sure each tube is inserted into the correct location - model/left, support/right.
- Slide the cooling hose flange under the retaining screws - tighten the 6screws
Post procedure
- Power system up
- Perform an Autohome XYZ
- Install new canisters if needed
- Load material to head (
Operator Control > Load/Unload material > Load Material )
- Perform a Auto Z stage zero calibration
- Perform a Auto tip-to-tip calibration
- Print a calibration job and configure the machine
META FILEATTACHMENT |
attr="" comment="" date="1182981082" name="HeadChangeProcedure.doc" path="Head Change Procedure.doc" size="39936" user="mmt" version="1.1" |
|