> > | Serial number: T0333
Software version: 2.4.0p1
Vantage startup procedure
- Hold down top UPS button until beep
- Close the small breaker
- Close the main breaker
- Hit the green flashing button within one minute. If you miss this one minute window, then power-down and start over again.
MACHINE MUST BE ONE AT LEAST FOUR HOURS BEFORE BUILDING PARTS
Vantage shutdown procedure
- Hit the red button
- Wait for message "It is now safe to turn off the machine."
- Wait for fans to completely stop
- Open the main breaker
- Open the small breaker
- Hold down the middle UPS button
Maintenance schedule
Every time |
Weekly |
Monthly |
Monthly/Quarterly |
Quarterly |
Clean platten |
Empty purge bucket |
Vacuum build envelope |
Inspect O-Ring |
Lubricate screws with TriGEL |
Lubricate guide rods with Krytox |
Inspect tip brush/wipers |
Clean vacuum filter |
Clean exterior |
Clean cone sensor |
|
|
|
|
|
|
|
|
|
|
21 Sept, MMT |
21 Sept, MMT |
21 Sept, MMT |
21 Sept, MMT |
25 Sept, MMT |
|
21 Sept, MMT |
25 Sept, MMT |
21 Sept, MMT |
21 Sept, MMT |
|